Cotton Belt “Silver Line” Regional Rail and Pedestrian Trail Projects

Cotton Belt Silver Line

ARS is currently performing civil engineering, land surveying and SUE services in support of this groundbreaking 26-mile light rail project extending from DFW Airport to Plano. The rail line will be open for service in 2023 and will operate with 30-minute peak and 60-minute off peak service.

ARS is performing boundary surveying and metes and bounds descriptions for over 30 critical parcel takes in support for the Rail project. We are also performing over 10 miles of civil trail design for the parallel Pedestrian Trail project and SUE at over 15 Pedestrian Bridge locations.


Services Provided

Rail Project:

Boundary surveying and metes and bounds descriptions for over 30 critical parcel takes

Trail Project

Civil Engineering for Trail Sections CB-01 and CB-02 (DFW Airport to Dallas North Tollway)

QL-B SUE at over 15 Pedestrian Bridge locations

Utility Conflict Matrix for entire 20+ mile trail corridor